Description of the work
Track renovation on Nagy Lajos király road between section Fogarasi road and Füredi street
Tramway track renovation on Haller street between section Soroksári road and Telepy street
Tramway track renovation on Kőbányai road between section Mázsa street and Liget square
Tramway track reconstruction on Fehérvári road
Providing independent engineering expertise from the bank in the implementation of Soroksár combined terminal investment, phase I
Renovation of Gödöllő suburban railway line between section Kerepestarcsa and Szilasliget
Renovation works of the East-West metro line – Preparation and consultancy
Renovation works of the East-West metro line – Reconstruction of surface railway track
Renovation works of the East-West metro line – Design and manufacture of rail tunnel tracks and rail-fastening items
Renovation works of the East-West metro line – Complete reconstruction
Reconstruction of the surface-running line between section “U” frame and Pillangó street and reconstruction of the test track on the East-West metro line
Participation in the evaluation of tenders, in the preparation of the expert committee report and in the conclusion of the contract in the public procurement of tower catenary equipment
Dél Buda – Rákospalota metro line preparation of section I
Szeged Tisza Lajos blvd. tramway track reconstruction between section Gogol street and Mérey street
Construction of the external infrastructural works at Savoya Park – extension of tram line 18
Fehérvári road track renovations between Albertfalva turnout – Budafok traffic road relating to the GRC investment
East-West metro line renovation – Providing engineering consultancy services
East-West metro line renovation – reconstruction of tunnel tracks
East-West metro line renovation – Surface traffic diversion and related works
Szajol – Mezőtúr MÁV railway line excavation works
Track reconstructions on the suburban railway line planned by BKV Rt. in 2004 – superstructure replacement of tie plate fastened tracks on Gödöllő suburban railway line between Hungaroring station – Mogyoród station on the left track between sections 225+50 – 247+80 and renovation of the platforms at Szilasliget stopping point
HÉV track reconstructions planned by BKV Rt. in 2004 – Szentendre suburban railway line partial superstructure replacement on the section between Szépvölgyi road and Tímár street stopping points
Partial reconstruction of tramway tracks on Nagykörút (Grand Boulevard) and Gubacsi road
Tramway track renovation on Erzsébet királyné road and track replacement at Kossuth square on tram line 2
Tramway track renovation on Pozsonyi road at the section between Tél st. and Nyár st., tramway track renovation on István road and track reconstruction on tram line 37
Design of the signalling system and the related infrastructure assets on the Budapest section of the Szentendre suburban railway line
Implementation of the underpass with 2×2 lanes and the related road network planned on the line Tihanyi road – Gárdonyi Géza road in Győr
Almásfüzitő – Komárom City area, rehabilitation of brownfield sites
Survey of slots and preparation of soil mechanics expert opinion on Gyoma – Békéscsaba railway line
Assistance for the implementation of Motorway M6
Design works relating to Budapest – Székesfehérvár, Tárnok – Kápolnásnyék and Dinnyés – Székesfehérvár line sections
Management of BKV Rt.’s investment projects on track construction in 2005.
Track construction in front of Kelenföld depot, District 11 and on Bartók Béla road (on the section between Tétényi road – Thallóczy Lajos st.)
BKV Rt. tram line 3, tramway track reconstruction on Fehér road at the section between Albertirsai alley and MÁV bridge
BKV Rt. tram lines 12 and 14, track construction works of the reverse curves of István road and Lőrinc street, and tramway track reconstruction works on Pozsony road at the section between Tél street and Nyár street
Reconstruction of the signalling system and the related infrastructure assets on the Budapest section of the Szentendre suburban railway line
Independent engineering management activities for the modernisation of the power supply network along Nagykörút (Grand Boulevard) tram line
Establishing the transport conditions for low-floor trams by platform reconstruction of tram line 4 and 6 on the Nagykörút (Grand Boulevard)
Establishing the transport conditions for low-floor trams – track construction works on Nagykörút (Grand Boulevard)
Establishing the transport conditions for low-floor trams – construction of ladder tracks in Hungária depot and works along the exit/entry route (Sport street) in Hungária depot
Rail project management for the construction of the railroad connection of Győr – Gönyű National Public Port
Performing the investment organisation, management and technical inspection tasks related to the public utility pre-development and road works of Zöld street in Győr
Performing the investment organisation, management and technical inspection tasks related to the public utility pre-development and road works of Erfurti street in Győr
Conducting the public procurement procedure related to the reconstruction of the tram-train junction at Anna fountain in Szeged
Conducting the public procurement procedures for road modernisations, pavement renovations, track reinforcements, bridge renovations planned for the period2006-2007 by Győr City
Construction of the 2×1 traffic lane on Szilágyi street, Budapest, District 4 between section Fóti road – Görgey Artúr street
Motorway M6 construction between M0 – Érdi tető
Providing consultancy in the MÁV – Érd, KIOP project
Performing technical inspection tasks related to the rail construction works on Gödöllő and Csömör suburban railway lines of BKV Zrt. and coordination of the reconstruction works of the overhead catenary line and the railway signalling system of the suburban railway during the Motorway M0 East sector between section main road No 4 – motorway M3 ” investment
Comparing the technical content under the aid application, financial agreement and the contract with the technical content of the work performed in the context of a comprehensive investigation during the review of the “Rehabilitation of the Budapest-Cegléd-Szolnok-Lökösháza railway line” project No 2000/HU/16/P/PT/001
Independent engineering services relating to obtain permits for the continued use of BKV Zrt. suburban railway lines (Ráckeve, Csepel, Szentendre, Gödöllő)
Budapest, East-West metro line reconstruction of ladder tracks at Fehér road depot
Budapest, East-West metro line reconstruction of ladder tracks at Fehér road depot – Organization of the metro freight transport
Budapest, East-West metro line reconstruction of ladder tracks at Fehér road depot – reconstruction of tunnel tracks
Review of the approved design for Rákospalota-Újpest railway station from the feasibility study on Budapest Keleti railway station (incl.) and Nyugati railway station (excl.) and the lead-in line groups and preparation of the schematic drawings for the Bp. Nyugati railway station –Déli railway station tunnel
Preparation of the approval designs, tender and execution drawings for the Canal Bridge Kajtor in the field of railway structures, railway telecommunication, railway overhead catenary line, geotechnical expertise and railway traffic operation tests
Budapest District 4, complete management and technical inspection tasks of the road renovation and public utility construction works of Váci road section between Megyeri road – Szilas-creek
Independent engineering management tasks relating to tramway track renovation works – the elimination of slow signs on tram line 56 section between Moszkva square – Budagyöngye
Independent engineering management tasks relating to tramway track renovation works – the elimination of slow signs on tram line 24
Independent engineering management tasks relating to tramway track renovation works – the elimination of slow signs on tram line 56 section between Budagyöngye – Hűvösvölgy
Independent engineering management tasks relating to tramway track renovation works – track renovations to be performed on tram line 28 and reconstruction of Könyves Kálmán blvd.  level crossing
Revising the train operation survey and the construction schedule of Kelenföld railway station
Motorway M6 design phase II, preparing the demolition plan and acquiring the demolition approval for the dirt road crossing at section 180+08 hm on MÁV Szekszárd – Bátaszék railway line
Participation in the evaluation of the Submitted Applications relating to the New Hungary Development Plan – Operational Programme for Transport – Action plan priorities 1 to 5
Engineering supervision relating to main roads No. 31-32 Jászberény bypass section phase II between km section 0+000-2+695
Motorway M6 phase II
Project coordination tasks for electric works in relation to the reconstruction works of the tramway junction at Anna fountain in Szeged
Performing technical inspection tasks relating to construction and installation works of transport infrastructure during the road and cycle path investments by Komárom City in 2008
Independent engineering management services relating to tramway track renovation works
Independent engineering management services relating to tramway track renovation works– track reconstruction of tram line 24 phase I, between Nagyvárad square – Balázs B. st. without the Nagyvárad square level crossing
Independent engineering management services relating to tramway track renovation works– track renovation works of tram line 30 – large panel track replacement along Gubacsi road between Timót st. – Szabadka st. and Vg48.5 track crossing replacement at Könyves K. blvd. – Mester st. junction.
Independent engineering management services relating to tramway track renovation works – renovation works of tram line 24 in 2009, track reconstruction between Orczy road – Elnök st. – Nagyvárad square and reconstruction of Nagyvárad square level crossing.
Independent engineering management services relating to tramway track renovation works – renovation works of tram line 24 in 2009 – track reconstruction between Festetics st. – Fiumei road and by the replacement of double track connection at the terminal station.
Independent engineering management services relating to tramway track renovation works – track renovation works of tram line (30) reconstruction of Ph coated tracks to Vg. S49 tracks between Haller st. – Vágóhíd st. and reconstruction of Vágóhíd st. level crossing – KÖZÉPSZOLG tram line 21
Providing engineering services relating to the complete management, technical inspection of the Intermodal Logistic Center – construction phase I of the so-called Railport Arad (RPA) Combiterminal Area within the area of Kürtös
Motorway M5 into the city, reconstruction of the level crossing at the intersection of (Gyáli road) – Hungária blvd.
Technical inspection of the demolition and building works relating to Buda main sewer – tram line 19
Providing design control tasks in the implementation (planning) of the project on the approval designs for the electrification of Mezőzombor-Sátoraljaújhely railway line “Detailed design tasks” (41099/B) and the project on the approval designs for the modernization of tracks and installation of electrical signalling system on Mezőzombor-Sátoraljaújhely line “Detailed design tasks” (42167/A)
Preparation of the project documentation for the modernization of the tram depot No 5 and the related infrastructure in the City of Riga in connection with the introduction of low-floor trams
Data collection and project analysis in relation to PPP developments of the Nagyvárad area in Romania
Performing technical inspection tasks in the field of road construction relating to the reconstruction works of Szent István road (phase I) in Tatabánya
East sector – Motorway M31 between section (0+000 – 12+410)
Performing technical inspection, organisation and management tasks for the renovation works (decorative surface coating installation, public lighting reconstruction, etc.) of Kazinczy street, Czuczor street, Csillag alley in Győr
Renovation of Záhony area broad-gauge hauling track network – Preparation of tender documentations
Providing engineering management tasks in the construction of M9 expressway between main roads No. 51 and 54 (section 19+000 – 31+300 km) and participation as an expert in the assessment phase of the public procurement for construction works
“Preparatory and management works as an independent engineer for the development, modernisation of the traffic control and passenger information system in the surface and underground transport (KMOP identifier: KMOP-2.1.3./A-2008-00002)”
Performing technical inspection tasks in the reconstruction of the Bp-Kelenföld(excl.) – Székesfehérvár(excl.) line section financed from Cohesion Fund and participation as an expert in the preparation of the public procurement for construction works
Providing engineering management tasks in the reconstruction of Bp-Kelenföld railway station financed from Cohesion Fund
Consulting and engineering service activities relating to the reconstruction of rail infrastructure on the Nagyvárad House of Culture of Trade Unions – Cele Trei Crisuri street – Dacia bridge line section
MKB Bank Metro line 4 contract no. Co-08 – Construction of tunnel and depot tracks. Performing Project Technical Advisory Services.
BKV Mozgólépcső Javító és Szolgáltató Kft. manufacturing parts
Providing technical inspection tasks in the field of tramway tracks and the related power supply infrastructure covered by the renovation of the Budapest Margaret Bridge and the construction works for the development of the related transport system
Reconstruction of Tárnok (excl.) – Kápolnásnyék (incl.) and Dinnyés (excl.) – Székesfehérvár(excl.) line sections on the Budapest– Székesfehérvár railway line (2003/HU/16/P/PA/013)
Performing tasks before the authorities relating to the continued use of BKV Zrt.’s railway lines (BKV Zrt. 14/T-291/09.)
Performing tasks before the authorities relating to the continued use of BKV Zrt.’s railway lines (BKV Zrt. 14/T-291/09.) – Szentendre design study
Performing tasks before the authorities relating to the continued use of BKV Zrt.’s railway lines (BKV Zrt. 14/T-291/09.) – North-South design study
Performing tasks before the authorities relating to the continued use of BKV Zrt.’s railway lines (BKV Zrt. 14/T-291/09.) – track dewatering execution drawings
Performing tasks before the authorities relating to the continued use of BKV Zrt.’s railway lines (BKV Zrt. 14/T-291/09.) – Suburban railway
Performing tasks before the authorities relating to the continued use of BKV Zrt.’s railway lines (BKV Zrt. 14/T-291/09.) – East-West metro line
Performing tasks before the authorities relating to the continued use of BKV Zrt.’s railway lines (BKV Zrt. 14/T-291/09.) – metro line M3 signalling system
Performing tasks before the authorities relating to the continued use of BKV Zrt.’s railway lines (BKV Zrt. 14/T-291/09.) – tram line 18
Performing tasks before the authorities relating to the continued use of BKV Zrt.’s railway lines (BKV Zrt. 14/T-291/09.) – tram line 61
Performing tasks before the authorities relating to the continued use of BKV Zrt.’s railway lines (BKV Zrt. 14/T-291/09.) – Csepel Suburban railway
Performing tasks before the authorities relating to the continued use of BKV Zrt.’s railway lines (BKV Zrt. 14/T-291/09.) – metro line M3 track data
Performing tasks before the authorities relating to the continued use of BKV Zrt.’s railway lines (BKV Zrt. 14/T-291/09.) – MILLFAV signalling system
Performing tasks before the authorities relating to the continued use of BKV Zrt.’s railway lines (BKV Zrt. 14/T-291/09.) – tram line 18 track data
Engineering consulting and technical expert services within the framework of the project management activities in the
“Szeged electric public transport development” project No. KÖZOP-5.2.0-07-2008-0002
Engineering consulting and technical expert services within the framework of the project management activities in the
“Szeged electric public transport development” project No. KÖZOP-5.2.0-07-2008-0002 – Pulz utca tram depot
Engineering consulting and technical expert services within the framework of the project management activities in the
“Szeged electric public transport development” project No. KÖZOP-5.2.0-07-2008-0002 – tram line 1
Engineering consulting and technical expert services within the framework of the project management activities in the
“Szeged electric public transport development” project No. KÖZOP-5.2.0-07-2008-0002 – tram line 2
Engineering consulting and technical expert services within the framework of the project management activities in the
“Szeged electric public transport development” project No. KÖZOP-5.2.0-07-2008-0002 – tram line 3
Engineering consulting and technical expert services within the framework of the project management activities in the
 “Szeged electric public transport development”project No. KÖZOP-5.2.0-07-2008-0002 – Power supply;trolleybuses 8 and 10
Engineering supervision of the construction works of the main road No. 4 Kisújszállás bypass between section 140+500-151+850 km
Preparatory and managing engineering works for the modernisation and extension of tram lines 1 and 3
Advisory services during the construction, technical inspection and supervision in the “Rehabilitation of Arad County Old Historical Center”
Establishment of Rákoskresztúr bus corridor and renovation of Pesti street, District 17
Improving the level of public transport service in Debrecen – development of network sections of trolleybus overhead catenary line
Drawing up Tram-train design instructions – proposing technical parameters both for tramway and rail infrastructure
and for vehicles
Providing technical support activities for the implementation of the KEOP project on Sewage disposal of Érd and environs
Preparation of pre-approval designs and execution drawings of AS919 and AS26 barriers, as detailed in Annex 1, within the framework of the approval design for the cycle path crossing to be established at section 19+32,35 on the Püspökladány – Szeghalom railway line No. 128
Preparation of the feasibility study and the approval designs for Hatvan (incl.) – Miskolc Tiszai railway station (excl.) line section
Arad – Establlishment of tramway level crossings – technical supervision and technical inspection in the field of tramway construction
Performing construction Technical Inspection tasks related to the development of Szajol(excl.) – Püspökladány(incl.) railway line
Performing inside technical inspection activities in the field of rail substructures and the preparation, update and structural coordination of traffic phase plans within the framework of design and implementation of construction of tracks and structures and the related temporary signalling system, telecommunications, public utility replacement and cable replacement works on the Piliscsaba(excl.) – Esztergom(incl.) line section
Arad – Grădiste Providing technical supervision and technical inspection services in the course of the rehabilitation of Grădiste level crossing
Arad – Micalaca Providing technical supervision and technical inspection services in the course of the rehabilitation of Micalaca level crossing
Surveying works of sections between József street – Üllői road (between sections 55+32 – 61+44) and a József blvd. – Bérkocsis street level crossing (between sections 52+26 – 52+62) on tram line 4 and 6 within the framework of the project “Renovation of József blvd. section of the tram line on Nagykörút (‘Grand Boulevard’) between Üllői road – Blaha Lujza square, Népszínház street turnout section”
Performing design tasks for the renovation of Szolnok railway junction and supervising and revising, as necessary, the approval designs of the Szolnok (excl.)- Szajol (excl.) line section, preparation of execution and tender drawings
Metro line 4 Délbuda-Rákospalota phase I – station structure construction at Tétényi road – Co-04/A
Metro line 4 Délbuda-Rákospalota phase I – station structure construction at Kelenföld railway station – Co-03
Metro line 4 Délbuda-Rákospalota phase I – Railway track construction – Co-08
Metro line 4 Délbuda-Rákospalota phase I – Kelenföld depot –Co-011
Metro line 4 Délbuda-Rákospalota phase I – station structure construction at Keleti railway station – Co-06/C
Metro line 4 Délbuda-Rákospalota phase I – Related surface investments
Miskolc urban tram network development – Providing engineering and technical inspection services
Miskolc urban tram network development – procurement of 31 newly manufactured tram vehicles and the supply of items necessary for their operation as well as the related services.
Debrecen urban tram network development (line No 2) engineering supervision
Performing technical inspection tasks relating to the construction of Borzán Gáspár street bus turn in Debrecen and the related roundabout at junction Borzán — Diószegi — Gizella streets